Temporary Works Design

Goods yaerd 500T mobile 63m of fly jib rigged.jpg
image.png
IMG_2680.jpeg

Working platform design

Working platform design for piling rigs and other large plant. Design to BRE470 and other standards as required. Can be produced in accordance with Network Rail Requirements (i.e. on a form C).

Mobile crane foundation design

Foundation design for mobile cranes and other lifting equipment. Design to Eurocode 7 (EC7) and other standards as required.

Settlement Analysis/Design

Settlement calculations to assess predicted settlement for situations. Can be used for optimisation of foundation design, substructure performance assessment, buried service protection.

Category 3 checks

Perform Category 3 checks in compliance with BS 5975 for various temporary works designs. Quick turnaround and pragmatic approach.